• JOB BOARD
  • POST A JOB
  • JOB SEEKERS
  • EMPLOYERS
  • TESTS
  • RESOURCES
  • WAGE ANALYSIS
Menu
  • JOB BOARD
  • POST A JOB
  • JOB SEEKERS
  • EMPLOYERS
  • TESTS
  • RESOURCES
  • WAGE ANALYSIS
CONTACT US
  • LOGIN

  • JOB BOARD
  • POST A JOB
  • JOB SEEKERS
  • EMPLOYERS
  • TESTS
  • RESOURCES
  • WAGE ANALYSIS
Menu
  • JOB BOARD
  • POST A JOB
  • JOB SEEKERS
  • EMPLOYERS
  • TESTS
  • RESOURCES
  • WAGE ANALYSIS
  • Login
  • LOGIN

  • ARTICLES
  • 06/05/2015

Welding in the Field – The Power of Handtools

Equipment repair eats at the bottom line. Every minute a machine is down is a minute of lost time, and minutes turn into hours. While downtime is sometimes unavoidable, workers can minimize it by having the knowledge and the right equipment on-hand to cut, prep and weld damaged and worn sections of steel quickly. Source: http://compactequip.com/hand-tools/welding-fields-power-handtools/

Equipment repair eats at the bottom line. Every minute a machine is down is a minute of lost time, and minutes turn into hours. While downtime is sometimes unavoidable, workers can minimize it by having the knowledge and the right equipment on-hand to cut, prep and weld damaged and worn sections of steel quickly. Being prepared for unexpected failures — which includes having the right engine-driven welder/generator on a maintenance truck — can make the difference between a profitable day and a day of lost profits.

Step 1: Cut Out Broken Steel
The first step in repairing any broken piece of steel is cutting out the damaged piece. Most contractors have oxy-fuel equipment readily available for cutting, brazing, soldering and preheating weld surfaces. However, plasma cutters offer lightweight portability and efficiently run off most engine-driven welder/generators, cutting up to 3/4 in., with 10,000 watts or more generator power. Engine-driven welder/generators also offer carbon arc gouging, though capacity varies greatly based on unit amperage.

When repairing a damaged section, removing all rough edges for proper fit up with the replacement piece can ensure faster repairs. Whether Flux-Cored or Stick welding, it is important to grind and remove any rust or oils that exist where the two pieces will be joined. While Flux-Cored and Stick welding are somewhat forgiving of an unclean surface, any contaminates may negatively affect weld penetration and lead to cracking or lack of fusion. Extra time spent on grinding and cleaning beforehand can prevent failures later.

power-miller-tips

Step 2: Match and Cut Replacement Steel
Equipment constructed out of abrasion resistant steel should be replaced with material offering an exact match in strength. Other components might be constructed of different alloys. Each application varies in terms of level of hardness, wear, resistance and tensile strength, so it is important to consult with an equipment dealer and stock up on the matching steel. An exact match helps guarantee weld quality and longevity, whereas steel of lesser strength can lead to premature failure and more downtime. Steel should be cut to its required size and the edges beveled at about a 30-degree angle. This angle allows for better penetration and is done effectively with an oxy-fuel or plasma cutting system. Rather than beveling the entire edge, leave a small portion at the bottom of the groove — about a nickel’s width — to better support the arc.

Step 3: Preheat to Eliminate Cracking
Fit the replacement piece into place and double check for any gaps and/or dirt, which can weaken the weld. After achieving proper fit, preheat the welding surface using an oxy-fuel torch outfitted with a special “rosebud” tip that widens the flame. This preheating removes hydrogen that can lead to cracking when an extremely hot welding arc is applied to a cold piece of steel. Preheating temperatures (200 to 400 degrees Fahrenheit is common) vary based on the material. Consult a welding distributor for specific heating instructions. Use a temp stick, sometimes referred to as a heat crayon, to check the heat. This marking changes colors at different temperatures, letting the operator know when a specific temperature range is reached and the piece is ready for welding.

Step 4: Electrode Selection and Welding Technique
Stick welding remains the most popular process for field repair, as it requires less equipment and is more forgiving in windy conditions. Common electrodes used in Stick welding are AWS E6010, E6011, E6013, E7018 and E7024 in diameters from 1/8 to 5/32 in. Each of these electrodes offer all-position welding capabilities (except 7024) and provide compatibility with the high tensile strength steels encountered in the field. Welding suppliers can provide more specific recommendations for the intended application.

A basic welding sequence may be as follows: Start by making a root pass with a smaller diameter (1/8-in.) electrode. Popular for the first pass, an E6010 stick electrode lends flexibility at this stage of weld and works well on open-root joints. The next passes can be made with a larger diameter (5/32-in.) stick electrode to deposit weld metal faster, as well as a rod with different properties. For example, an E7018 stick electrode is popular for its high strength. Repeated passes should be made until completion, with the slag (protective flux coating) removed with a grinder in between each pass.

Step 5: Select a Welding System
Selecting the right machine is based largely on the diameter of electrodes used. A 1/8-in. stick electrode welds up to about 145 amps, while a 5/32-in. stick electrode works best around 180 amps. Therefore, a welder/generator with a 100 percent duty cycle at 325 amps offers more than enough welding power to fill most Stick welding needs.

If carbon arc gouging applications will be required regularly, the machine size needs to match the carbon diameter that will be run. If performing field repairs with the Flux-Cored process, a welder/generator with constant voltage (CV) output provides far superior wire welding performance than a constant current (CC) machine. A CV output is also necessary for short-circuit MIG welding for general fabrication. Amperage requirements vary based on the type and diameter of wire being used, but 250 to 350 amps are usually sufficient for most applications.

Welding manufacturers have reduced the physical size and weight of machines, made them much quieter and added other capabilities optimal for maintenance trucks. Contractors benefit from the dual welding/power generation functions, which further save space on a truck by eliminating the need for a standalone generator and providing the power to run grinders, drills, chop saws, lights and air compressors (to run air tools) on the jobsite.

For heavy-duty repairs and space savings on trucks, fleet managers may want to consider a welder/generator option with dual-operator capabilities. This type of configuration maximizes fuel savings and increases flexibility by allowing multiple welders to be plugged in to create a multioperator platform. For proper equipment and machine size selection, it is important to identify the amount of space required on a maintenance truck and to understand the needs and applications that will be used most.

Some contractors opt to designate a portion of their fleet as “general maintenance trucks” and equip them with smaller engine drives, while designating others as “heavy-duty repair trucks” and equip them with more powerful and versatile units. Taking time now to investigate equipment options will save time when it counts most — when a critical piece of machinery sits idle, waiting to be fixed. Using the tips outlined here — and the right engine-driven welder/generator for the application — can help guarantee that critical machinery starts making money for the contractor when field repair becomes necessary.

More Articles

Want Better Diesel Mechanic Jobs?

  • Uncategorized ·
  • 12/04/2025·
Tired of sending out applications and hearing nothing back? At Mechanics Hub, our recruiters work directly with the hiring managers. That means faster interviews, real…
SEE MORE

Your Next Move = Your Biggest Opportunity

  • Uncategorized ·
  • 12/04/2025·
Tired of being undervalued? Still waiting for a raise, better tools, or a chance to grow? Your skills are worth more — and we’ll help…
SEE MORE

Hands-On Work. Huge Machines. Big Future.

  • Uncategorized ·
  • 12/04/2025·
If you like getting your hands dirty, solving real-world problems, and working on massive machines that power entire industries… Then it’s time to think about…
SEE MORE

Did You Know? Diesel Mechanics are one of the most versatile trades in the world.

  • Uncategorized ·
  • 12/04/2025·
From highway trucks to construction equipment, from marine engines to standby generators — diesel techs keep everything moving. Your skills apply to: Long-haul and vocational…
SEE MORE

Your Next Diesel Mechanic Job Is Here!

  • Uncategorized ·
  • 12/04/2025·
Ready to make a move? Mechanics Hub has hundreds of full-time, direct-hire opportunities across North America — and we’re not talking about just any shop.…
SEE MORE

Heavy Equipment Mechanics: A Rewarding Career Path More People Should Be Talking About

  • Uncategorized ·
  • 12/04/2025·
In a world obsessed with tech jobs and office perks, there’s a critical trade keeping infrastructure, construction, mining, and agriculture industries moving — heavy equipment…
SEE MORE
  • Terms and Conditions
  • Privacy Policy
  • Cookie Policy

Quick Links

  • Home
  • Job Board
  • Employers
  • Job Seekers
  • Tests
  • About Us
  • Contact Us

Positions We Recruit

  • Heavy Equipment Technicians
  • Heavy Truck Mechanics
  • Parts, Service & Management

Connect With Us

Toll-Free #: 1-888-620-5111

Local #: 416-620-5111

E-Mail: [email protected]

Headquarters

2800 Skymark Ave Suite 500

Mississauga, Ontario

Canada L4W 5A6

© Mechanics Hub Inc. All Rights Reserved

Website Managed By StableWP

Ask Us a Question

Hidden
State and Country(Required)
This field is for validation purposes and should be left unchanged.

Unlimited Package Inquiry

This field is for validation purposes and should be left unchanged.

Refer a Friend

This field is for validation purposes and should be left unchanged.
Hidden
State and Country(Required)
This field is for validation purposes and should be left unchanged.

Success!

Your application has been submitted to the employer successfully.

Heavy-Duty Mechanic - Trucks & Equipment

Twinsburg, OH, United States

VIEW MORE JOBS
CONTACT us
  • LOGIN

  • Home
  • Post a Job
  • Resources
  • Job Board
  • About Us
  • Job Seekers
  • Employers
  • Tests
  • Wage Analysis
  • Contact Us
Menu
  • Home
  • Post a Job
  • Resources
  • Job Board
  • About Us
  • Job Seekers
  • Employers
  • Tests
  • Wage Analysis
  • Contact Us

©2023 Mechanics Hub Inc.All Rights Reserved